Service
Bespoke Bathroom & Kitchen Fitting in London
A bespoke bathroom or kitchen installation covers the full sequence: strip-out, plumbing and electrical first fix, walls and floors, then fitting and finishing. ERCO Home Improvements installs bathrooms and kitchens across London, carrying out the plumbing, tiling and joinery in-house rather than subcontracting each stage.

Where bathroom and kitchen projects go wrong
Almost every failure in a bathroom is a waterproofing failure, and almost every waterproofing failure happens before a single tile goes on. Tiles and grout are not a waterproof layer. In a wet area, the substrate has to be a board suited to the job and the junctions have to be tanked — corners, floor-to-wall joints, and anywhere a pipe passes through. Work done properly at this stage is invisible for twenty years; work skipped here shows up as a stained ceiling downstairs.
Kitchens fail differently. The usual problem is that services were positioned to suit the old layout, so the new units are built around compromises — a waste run with barely any fall, a boiler flue in the wrong place, sockets that end up behind an appliance. Moving services during first fix is straightforward; moving them after the units are in is not.
Sequence and levels
The order is strip-out, then any structural or layout change, then first fix plumbing and electrics, then boarding and tanking, then screed or floor build-up, then tiling, then units and sanitaryware, then second fix and sealing.
Levels are set before tiling starts, not discovered during it. Floors in older London properties are rarely flat, and a floor that falls 15mm across a bathroom will make a wall-hung unit look wrong no matter how carefully it is fixed. Correcting that in the screed is routine; correcting it later is not.
Materials and how they behave
Natural stone — marble, limestone, travertine — is porous and needs sealing before grouting and periodically afterwards. It is unforgiving of standing water and of the wrong cleaning products. Porcelain is harder, effectively non-porous and far more tolerant, and large-format porcelain now reproduces stone convincingly enough that the practical choice is often the better one.
Solid timber moves with humidity, which makes it a poor choice for a bathroom floor and a considered one for a kitchen. Engineered board is stable enough for both and can be sanded back if it is damaged.
Questions
Common questions
How long does a bathroom installation take?
A straightforward replacement in the same layout is usually a matter of weeks rather than days, because tanking, screed and tile adhesive all need curing time between stages. Moving the layout adds first-fix plumbing work and extends the programme.
Do you supply the sanitaryware and units, or do I?
Either. Many clients specify and order their own; others prefer the items to be sourced as part of the commission. What matters is that the final selection is fixed before first fix, because pipe positions depend on it.
Is natural stone a good choice for a bathroom?
It can be, but it is porous and needs sealing and ongoing care. Large-format porcelain gives a similar appearance with far less maintenance, and in a family bathroom it is usually the more practical choice.
Where we work
Bespoke Bathrooms & Kitchens across London
Also
Whole-House Renovation
A single craftsman overseeing every discipline. No handoffs, no excuses, no surprises.
House Extensions
Side returns, rear additions and loft conversions — architecturally coherent, structurally uncompromising.
Flat Roofing & Roof Lanterns
GRP fibreglass flat roofs and glazed roof lanterns that flood a room with light — watertight and built to last.
Discuss your project
Send a message with a few photographs and a description of what you have in mind. You will get a straight answer about whether it is something we can take on, and roughly what it involves.
Or email info@ercohomeimprovements.co.uk